Max-Planck-Institute
|
| AKB constructed special adjusting bearings for the Max Planck Institute for Plasma Physics. We used high tensile fine-grained steel S960QL (1.8933), as well as unalloyed and middle alloyed materials S235J2G3/S355J2G3 for the manufacturing process. | |
| |
Repair welding for the MS Georg Büchner | | AKB repaired the boiler on the famous ship MS Georg Büchner on behalf of the development association "Traditionsschiff e.V." | |
| |
| lamp
We manufactured and installed a lamp
made from rustproof and corrosion-resistant
high-grade steel for the foyer of our new
office building located in the new industrial
area next to the B96 arterial road.
(Material 1.4571)
|